跳过导航链接Welcome -> Homepage -> News -> Automated Cranes Arrived In Qingdao Port

The First Batch of Automated Cranes of ZPMC Arrived in QingDao

    The first batch of fully automated cranes provided by ZPMC arrived at QingDao Terminal, the first fully automated terminal in Asia in mid-April. The electric control system of STS and AGV, the contection control package ( Abbr. ECS) between stand-alone control system to TOS are all offered by ZPMC Electric.

    Please follow our UAV to enjoy the view.

    What is the Automated Terminal going to be after put into service? The video below shows the view of real-ship handled by Xiamen Automated Terminal.

(Provider WangChen Editor ZhengLinglin)

All rights reserved:© 1993-2020 ShanghaiZPMC Electric Homepage:http://ez.zpmc.com/
Email:automation@zpmc.com
Techinal:86-21-31193969
wechat
Wechat